Minister wants officials to speed up preparatory work to resume SLBC tunnel excavation

He says NGRI and GSI to conduct two surveys to map strata in the tunnel route

Minister wants officials to speed up preparatory work to resume SLBC tunnel excavation
He says NGRI and GSI to conduct two surveys to map strata in the tunnel route